No Nama Peserta K A T ST P PT HN H P PK Alasan
1 PT. DINAMIKA SARANA INOVASI - 72.751.477.0-404.000 72,43 Rp. 95.530.000,00
Rp. 95.530.000,00
di bawah 80% Nilai HPS
2 PT. Bina Jasindo Sainstek - 21.006.328.5-024.000 79,25 Rp. 98.230.000,00
Rp. 98.230.000,00
di bawah 80% Nilai HPS
3 PT.ARSITO BANGUN SELARAS - 03.022.080.0-076.000

4 GAMAPLAN CONSULTANT - 31.695.023.7-417.000

5 CV. ADITYA - 75.604.555.5-448.000

6 kawan joymor - 31.567.399.6-407.000

7 PT. TRIKON MITRA ABADI - 66.057.525.9-542.000

8 GARIS TEBAL SEJAJAR - 31.824.257.5-429.000

9 CV METRO INDO KARYA - 71.924.123.4-412.000

10 CV. BUMI PARAHIANGAN - 02.268.799.0-434.000

11 CV.PERSIKAT - 31.213.765.6-412.000

12 CV. MEDITYA KARYA - 75.604.412.9-448.000

13 CV. ADHI PANCA - 73.835.696.3-404.000

14 PT. LAMBOK ULINA - 01.395.575.2-005.000

15 PT. Moses Edgar Partogi Utama - 75.065.530.0-435.000

16 CV. JAPHE METHE SADAYA - 71.892.371.7-404.000

17 CV. MITRA ABADI - 71.933.143.1-412.000

18 PT. BUANATAMA DIMENSI CONSULTANTS - 01.567.324.7-015.000

19 CV. CAHAYA ABADI CONSTRUCTION - 74.449.868.4-404.000

20 CV. FADILLA - 02.269.252.9-404.000

21 CV. Griya Cipta Consultan Engineering - 01.536.132.2-404.000

22 PT. ANDAYASA DWICIPTA - 01.721.467.7-063.000

23 PT. PANDAWA GAPA PUTRA - 01.569.373.3-017.000

24 PT. ROHIM KHOIRUL CIPTA SENTOSA - 03.260.697.2-061.000

25 CV.SURYA - 01.633.043.3-404.000

26 CV. SIGMA SAGALA - 02.876.530.3-404.000

27 CV.CIPTA SELARAS - 01.464.946.1-404.000

28 PT. Gumilang Sajati - 02.778.681.3-423.000

29 PT. PARADHIGUNA DWIPANTARA LOKA - 72.003.128.5-822.000

30 CV. AMAR JAYA - 74.623.261.0-404.000

31 CV.SITOR BOGOR - 73.958.552.9-403.000

32 CV. Catur Prima Karya - 31.534.085.1-434.000

33 LOJI KAMOLAN - 01.671.059.2-404.000

34 CV. MITRA KARYA - 03.328.342.5-412.000

35 PT. BUMI MADANI - 03.178.300.4-015.000

36 CV.JAYA DIVA - 66.579.379.0-334.000

37 CV. ANDALAN DESAIN ENGINEERING - 80.872.585.7-421.000

38 CV MAJU TERUS - 81.277.592.2-436.000

39 cv. putri kencana - 70.955.403.4-451.000

  • A Evaluasi Administrasi
  • T Evaluasi Teknis
  • ST Skor Teknis
  • P Penawaran
  • PT Penawaran Terkoreksi
  • HN Hasil Negosiasi
  • SH Skor Harga
  • SA Skor Akhir
  • K Evaluasi Kualifikasi
  • SK Skor Kualifikasi
  • SB Skor Pembuktian
  • H Evaluasi Harga/Biaya
  • P Pemenang
  • PK Pemenang Berkontrak